You are currently viewing Home 01: two walls monitored before renovation

Home 01: two walls monitored before renovation

This Humidistop France case file brings together the observations available for one building. It is intended to help property owners prepare a project from dated records, the construction materials and the conditions of each sample.

Private-home reference; the owner’s name and address are withheld.

Readings from 2014–2017; the dates on the cover and in the table do not match exactly.

Measurements recorded in the report

Measurements recorded in the report
Sampling point Initial record Follow-up record
North wall 3.9 gr/100 1 gr/100
West wall 10 gr/100 5.5 gr/100

The units reproduce the report. The samples are recorded at 30 cm above the floor and 20 cm deep. The document instructs the owner to maintain an electrical supply but does not identify the exact model.

How to interpret the follow-up

The report describes the rising-damp drying process as complete, while also identifying water penetration on the west side and drainage work still required.

Preparing the next steps for your building

Before selecting equipment, locate the affected walls on a plan and separate rising damp from rainwater entry, plumbing leaks and condensation. Keep dated photographs and note any changes to gutters, drainage, ventilation or wall finishes. These details matter when discussing coverage and placement.

What can this reference establish?

The figures describe the sampled points and the visits stated in the document. They do not establish a uniform condition throughout a building. Where locations or sample conditions changed, keep that limitation alongside the result. Finishing work should follow the actual condition of the substrate and any salts remaining in it.

How should equipment be compared?

Compare the exact technical reference, its coverage diameter, installation instructions and power requirements. ATE equipment is electromagnetic and uses electricity; ATG equipment is geomagnetic and operates without a mains connection. Keep the historical model in the report distinct from a model currently on sale. Address other water sources as part of the project.

Other Humidistop France references

Source: Humidistop site report supplied for this reference. Conclusions are attributed to that document; readings retain their original units and sampling limits.